[Updated November 2022]
AMAFCA is poised to start the last phase of construction of the Valle de Oro Drainage Facility. The Valle de Oro Barr Improvements Project includes a shotcrete water quality structure, , reconstruction of the Barr Spur channel, construction of a 10ft x 7ft and 8ft x 6ft concrete box culverts for the Barr Spur and Barr Interior Drain, respectively, and relocation of a water transmission pipeline. Construction on the Barr Improvements Project is scheduled to begin in Winter 2022 and is projected to be completed in Summer 2023. Please visit the Valle de Oro Wildlife Refuge website for updates on major changes to the Valle de Oro Wildlife Refuge access for visitors.