AMAFCA FY 2008 Project Schedule Page: 14
AMAFCA Project Manager: Kurt Wagener, P.E.
Design Engineer: ASCG, Inc.
Construction Engineer: --
Contractor: --
Region:
District: 3 – Director Tim Eichenberg
Description: This project will construct a low-flow channel diversion, debris removal structure, and secondary storm water quality pond for storm water quality enhancement. Project will make first local use of “Coanda” screen technology to filter storm water.
Current Status Report: In design.
Construction Schedule: To be constructed winter 2007-2008.
Public Meetings: None scheduled
Past Public Meetings: None
Available Documents: None